SCOPE OF WORKS
Construction of D&C of St George Bridge
Terranovus Bridges was engaged by Terranovus Civil to for the Design and construction of the St George Bridge for Cook Shire Council.
Design Works include the complete design component, geotechnical investigation, detailed survey and general arrangement costing options. Onsite Works include, operations of Mobile Concrete Batching Plant, Installation of Driven Piles, construction of Abutments and Central Pier, installation of PSC Deck units with In-situ Concrete Deck and Kerbs, Rock Protection, Approach Works and Roadworks and Demolition of the existing structure.